ERP提前期的定义及运算
上传于|0|0|文档简介
&&ERP提前期的定义及运算
阅读已结束,如果下载本文需要使用2下载券
想免费下载本文?
定制HR最喜欢的简历
你可能喜欢以下试题来自:
单项选择题关于提前期下列说法错误的是()
A.分运输提前期、生产提前期、采购提前期
B.提前期一般会受到需求批量的影响
C.提前期全部在物料资料中定义。
D.提前期分为固定提前期和变动提前期
为您推荐的考试题库
您可能感兴趣的试卷
你可能感兴趣的试题
A.物料属性
B.订单合并策略
C.订货策略及相关参数
D.需求时界和计划时界
A.期间订货量
B.再订货点
C.安全库存
D.固定批量
A.指需求来源为独立需求
B.指需求来源为相关需求
C.要进行主生产计划运算
D.此物料不进行需求计划计算
A.物料需求计划
B.主生产计划
D.以上皆是
A.是实际的物料
B.与配置类物料配合使用
C.在BOM中只能是配置类物料上级
D.可在仓库进行组装查看: 6224|回复: 13
请教各位大侠一个关于变动提前期的问题?
论坛徽章:0
提前期可分为固定提前期,与变动提前期?
固定提前期是不因生产数量或采购数量而变化,变动提前期则因这些而变化,但不知在Item Master中是如何实现变动提前期的?
主生产计划或物料需求计划所用的提前期为
& &= 固定提前期 + 变动提前期
而其中变动提前期与生产/采购的数量有关系,不知如何在ItemMaster中设置?
另外,如这种物料指定了工艺路线,那么在此还设置变动提前期,还有意义吗?
论坛徽章:1
我这里仅列出QAD在物料主文件建立时,所需要设置的一些提前期:
1.制造提前期
说明:The normal or average number of working days it takes to manufacture this item, including the time to process paperwork, issue components, inspect the finished product, and receive it into stock.
For items with Pur/Mfg code = [M], the manufacturing lead time may be calculated from the item's routing/process, as part of the Routing Cost Roll-Up. Any setup time is divided by the item Order Quantity. MRP uses this lead time to determine the suggested release date for planned orders.
When a work order is entered for a purchased or manufactured item, the system uses this lead time to calculate the release date or due date.
The value entered in Item Master Maintenance is used as the default for all sites. It may be changed manually for any site as needed.
If there are different routings/processes at each site, manufacturing lead time may be rolled-up by site.
Co-products will assume the manufacturing and cumulative lead time values found on their base process during the Cumulative Lead Time Roll-Up.
By-products assume the cumulative lead time of the base process. The Manufacturing Lead Time is not updated.
If a manufacturing lead time is entered for a DRP item (Pur/Mfg = D) it will be included in the cumulative lead time for the item.
2.采购提前期
3.检验提前期
4.提前期:说明:
A system maintained field recording the cumulative lead time for the item in calendar days.
This field is calculated using the Cumulative Lead Time Roll-Up function. It is the longest possible length of time it would take to have this item/product available if you started today with no components in stock. The system looks at the manufacturing lead time of this item and its subassemblies, and the purchasing lead time of the raw materials to determine the critical path.
Take assembly operation: You are making washing machines from all purchased components. Most components have a purchasing lead time of 4 days or less, except motors which have a purchasing lead time of 20 days. If it takes 2 days to assemble the machine, the cumulative lead time for a washing machine is 22 days--the longest possible time.
Co-products will assume the manufacturing and cumulative lead time values found on their base process during the Cumulative Lead Time Roll-Up.
By-products assume the cumulative lead time of the base process. The Manufacturing Lead Time is not updated.
Cumulative lead time is useful for order promising. If no production is scheduled, you should be able to promise availability within this period of time.
论坛徽章:0
你要讲设置的话,就要对具体的系统来讲了,不同的产品有不同的设置,
变动提前期是跟数量有关的,你的理解是对的,在具体做的时候一般的产品是有比率和批量两中方式,就是线性的和分段式的,如:
F(x) = aX ;
F(x) = a*k (n1&= x&=n2&&k=k1;n2&= x&=n3 k=k2 ......)
做设计时也是这样的,
有些产品可能没有这样的功能,那就没办法,除非自己开发了。
论坛徽章:21
一个是计划提前期,一个是实际提前期,MRP计算出来的结果不需要那么精确,
可以参考fly_trave 的方法,
可以在SFC或PAC中再调整
论坛徽章:6
问: 物料的提前期很重要,先假设如下的离散型A型BOM结构:
& & A由B与C组成,B又以D与E组成,
那么物料A的提前期,是指由B与C生产出A的时间(或者说是单级BOM),还是指由采购等开始到A完工的时间呢?我理解为前者,不知是否正确? 另外,如何把提前期与产量联系上,不知变动提前期如何确定,是经验值吗? 是一个关于变动批量的一个函数关系?
=& 你说的对. A的提前期是指前者.
=& 提前期是按一个产品来设变动提前期和固定提前期的, 与产量没有关系.
=&&&MRP分解所用的提前期=固定提前期 + 生产批量 * 变动提前期
=& 生产批量需要在系统中设置.
=& 变动提前期与固定提前期由生产过程中每一步工序所用的时间来确定.
=& 这个时间可以用经验值, 也可以用秒表测量.
=& 生产工序中每一步的时间与生产数量无关的部分构成固定提前期, 与生产数量有关的部分构成变动提前期.
论坛徽章:5
回复 #5 gerxj 的帖子
理解的透彻啊,学习了
论坛徽章:5
变动提前期与固定提前期由生产过程中每一步工序所用的时间来确定.
生产工序中每一步的时间与生产数量无关的部分构成固定提前期, 与生产数量有关的部分构成变动提前期.
这两条解决了我的困惑.哈哈
论坛徽章:5
回复 #7 numberandnet 的帖子
好帖怎么不讨论啊,
论坛徽章:50
变动提前期一般都很难确定,一般都根据经验值来设定,没啥可讨论的。
论坛徽章:15
提前期=固定提前期+变动提前期系数*本次数量/标准批量。
变动提前期指生产一个标准批量所需要的时间。